Machinery Equipment Transport
Posted on 26th September 2024 at 14:09
The above photo is an example how big the bespoke timber cases can reach! Here we have our dedicated production staff standing in front of a moulding machine that has been packed within 14 hours of arriving on our site.
The moulding machine will now be on the way to Dubai, UAE via sea freight.
The bespoke case has been fitted with internal protective packaging to ensure that the machine will not get wet during transportation by sea. Also silica capsules would have been added inside the case to ensure that there are no issues of condensation between the temperature differences between the UK and UAE.
Crating Solutions UK Ltd is proud to offer lead time within 4-7 days on receipt of an order so if you wish to transport a heavy duty item via road, sea or air please do not hesitate to get in touch.
Share this post: